Employers and principal contractors must proactively manage the risks associated with high winds on construction sites, to reduce the risk of serious injuries and fatalities.

This safety alert reminds principal contractors, site supervisors and workers of the risks associated with high or strong gusting winds, which are often associated with very low-pressure systems, thunderstorms, squalls, willy-willies, mini cyclones and cyclones.

The risk

Construction sites can have varying levels of risk from strong or gusty winds, depending on the stage of the build, the associated plant and materials on-site and the general environmental conditions of the site.

In recent years, there have been serious incidents involving the collapse of masonry walls and scaffolds reported to SafeWork NSW.

Masonry and other walls

A collapsed wall on a building site.

Walls under construction or demolition can be at risk of collapse in high winds due to the lack of lateral support usually provided by permanent wall returns or other sections of the final structure.

Newly built masonry walls have a reduced mortar strength and can have a line of weakness through damp course membranes.

Scaffolds

A collapsed scaffold

Scaffolds can collapse, fall sideways or have loose items blown off work platforms in high winds and adverse weather.

What you can do to stay safe

Site managers must make adequate preparations to deal with high or strong gusty winds in their workplace.

  • Ensure all workers and others are warned about the dangers of inclement weather on site
  • Check weather forecasts and monitor conditions regularly (see links below)
  • For sudden or short-term weather events cease work until high or gusty winds have subsided
  • Ensure structures under construction such as brick/block walls, partition walls, prefabricated concrete panels are adequately braced or otherwise supported from collapse due to wind loads
  • Ensure scaffolds are adequately designed for wind loading and check they are securely tied to the building or structure. Particular attention is needed to ensure planks are lashed securely and if containment sheeting, cladding or signage has been added due to the additional forces on the scaffold. Consult the designer or an engineer if you are unsure
  • Ensure temporary structures such as screens, formwork/falsework, site fencing or similar are adequately designed for wind loading and check they are securely tied to the building or structure
  • Ensure any temporary fencing arrangements, especially those with mesh installed, are secured to prevent them from falling over
  • Secure all loose items, materials and signage to ensure they are not blown off the site
  • Cease crane operations when the wind speed exceeds the manufacturers specified limit. The manufacturer may specify different limits depending on the activity
  • Do not use indoor rated elevating work platforms outdoors or in partially completed structures where the lack of walls or roofs leaves them exposed to winds
  • Do not operate hoisting equipment (personnel or material) in high or gusty winds, refer to manufacturers’ guidelines
  • Ensure dusts are controlled or minimised in high or gusty winds
  • Ensure that tools are packed away and building materials secured to prevent them from being becoming airborne
  • Wear eye protection to keep dust, debris and other foreign particles from blowing into the eyes
  • Where hard hats are a falling object hazard ensure chin straps are worn.

Masonry and other walls special note

  • Do not seek shelter behind walls of incomplete structures during extreme weather events, even if temporary supports are in place
  • Sequence construction so that masonry walls are constructed at the same time as cross walls or returns
  • Provide additional temporary support for lintels or other structural elements that place concentrated loads onto green masonry
  • Avoid placing lateral loads on walls not yet secured into the structure, eg - do not lean materials against the walls.

Related information

  • Wind Finder
  • Bureau of Meteorology
  • Contact SafeWork NSW on 13 10 50
Back to top

Contact us

Phone

13 10 50

National Relay Service

If you have a hearing or speech impairment, you can contact us through one of the options below.
Voice calls
Voice calls or telephone typewriter (TTY) call 133 677 then ask for 13 10 50
Speak and listen
Speak and listen service call 1300 555 727 then ask for 13 10 50
SMS
SMS relay service on 0423 677 767 then type 13 10 50
Internet relay
Make an internet relay call then type 13 10 50
Community
  • Events
  • Accessibility
  • Order a publication
  • Subscribe – SafeWork newsletters
Legal
  • Privacy
  • Right to Information
  • Terms
  • Disclaimer
  • Copyright
Related sites
  • SIRA (workers compensation)
  • TestSafe
  • icare

Contact

Contact us 13 10 50

Follow us

  • facebook
  • youtbue
  • linkedin
Send us your feedback

Follow us

  • facebook
  • youtbue
  • linkedin
  • Sitemap
  • nsw.gov.au
  • Ministerial media releases
NSW SafeWorks logo NSW SafeWorks NSW SafeWorks logo NSW SafeWorks